Send the doors you want controlled, how many people need to get through them, and the date the building has to be ready. ClearMax Labs replies with questions or a written scope for the Miami access control project, built from the details you provide.
Last updated: November 2026
Send the door list
Calls to this number may be recorded or answered by an automated assistant. Please do not share door codes, badge numbers or alarm codes by phone.
What helps the first reply most?
- The address, so the scope names the right building department. In Miami-Dade that can be the county or the city the building sits in.
- Each door and what it protects: main entrance, back door, IT room, storage, a stair door, a gate.
- What is on the doors today: keys, a keypad, an older card system, an intercom.
- A photo of each door and its frame, from both sides if you can. Glass, metal and wood frames take different locks.
- How many people, and whether anyone works across more than one location.
- The ready date, and whether the space is under construction or already in use.
- Any add-ons, such as an entry intercom or door cameras, so they share the cable plan from the start.
Why does the date matter in Miami?
Permits sit on the schedule. Miami-Dade's permitting procedures put access control among the trades that file plans with a new permit application. The county also says the ninth edition of the Florida Building Code takes effect on December 31, 2026, and applications submitted from that date must comply with it. A project aiming for January is planned with that in mind.
What should stay out of the form?
Codes and badge numbers. The door list and the photos are enough to plan the work. Credentials are issued on site at handover, so nothing that opens a door ever needs to travel by email or sit in a form.
Is a door stuck right now?
This form plans projects. For a lock that will not release today, call whoever installed it. Existing ClearMax clients use their service plan.
What follows once the list arrives?
A reply with any questions the door list leaves open, then a written scope naming each door, its hardware, the permit plan and the dates. If something turns up later that changes the work, it is raised with you and the scope is updated before anything proceeds. The scope also lists what the business provides, like ceiling access, a spot in the IT room and a contact on work days.
